ASPA Traffic Technologies LLP works as an OFC cable laying contractor for highway ITMS, telecom backbone, surveillance and smart corridor projects. Our team executes optical fibre cable laying with attention to chainage planning, right-of-way constraints, duct continuity, cable protection, joint access and documentation. The work can include route survey, trenching, HDPE PLB duct laying, DWC or GI protection at critical crossings, HDD coordination, chamber readiness, OFC cable blowing or pulling, jointing, splicing, termination and OTDR testing.
- Route survey, chainage marking and utility coordination before excavation or duct laying begins.
- HDPE PLB duct laying in median, shoulder or right-of-way areas with DWC/GI protection where required.
- OFC cable blowing, pulling, jointing, splicing and termination by trained field teams.
- OTDR testing, fibre link verification, route markers and as-built documentation for handover.
- Execution support for highway ITMS OFC networks, telecom fibre routes and surveillance communication backbones.